what setups are done in BOM?
Answers were Sorted based on User's Feedback
Answer / vani
1.Set Profile Options(Required)
2.Define Exception Templates(Optional)
3.Define and Build your Workday Calender(Required)
4.Assign Workday Calender to organization(Required)
5.Define Bills of Material Parameters(Required)
6.Define Department Classes(Optional)
7.Define Resources(Optional)
8.Define Resources Groups(Optional)
9.Define Simulation Sets(Optional)
10.Define Locations(Optional)
11.Define Departments(Optional)
12.Assign Resources and Resource Shifts to Departments
(Optional)
13.Define Overheads(Optional)
14.Associate Overheads with Departments(Optional)
15.Define Alternates(Optional)
16.Define Bills of Material Components(Optional)
17.Define Standard Instructions(Optional)
18.Define Change Order Types(Optional)
19.Define Delete Constraints(Optional)
Is This Answer Correct ? | 8 Yes | 0 No |
what is an attribute from which we can distingwish an orgnisation and master item organisation?
What are the Required Setups need to be done in Inventory?
what are reference designators and how they are used practically .Please site few examples.
How Many Inventory Org can be/are there
What to mean by Multi Org? what are all the multi org setups?
How do you ensure on and availability are daily base for min max planning?
What setups are done in WIP?
What is the diffrance between std job and non std job?
What is Reorder point and Reorder quantity? and what is its significance?
Explain the OSP cycle?
Work order-less Completions
In osp cycyle i have one finished goods -FG1 Raw material - RM1 Osp Item - OSP1 Resource -Ospres01 Charge Type -PO Move I assign dept, then i created routing and bom. then i realsed job the PO requestion Generated But when i replace on another OSP ITEM - OSP2 for OSP1 having same attributes i am not getting Po requestion CAn any one help me? Thanks in advance, Raghunandana raghu.nandana@rediffmail.com