What is production support procedure? How to login
production support? what is transaction code?
Answers were Sorted based on User's Feedback
Answer / venkatareddy
1. The customer or the end user logs a call through any
tool or by mail
tools are:
(RADIX).
Remedy
Service Desk (SD4)
Perigreen
lotus notes
2. Each one of the support team is a part of support group.
3. Whenever a customer logs a call he /she have to mention
to which work group (by name).
4. Once the calls came to the work group the support
consultant or the team needs to send an IR (Initial
Response) to the user depending upon the priority of the
calls. (Top, High, Med, Low, None)
5. Then the error is fixed, debugged by the support
consultant or the team. Then after testing properly by
generating TR (Transport Request through the basis admin)
6. Then it is informed to the end user/customer/super user
about the changes which have moved to the production server
by CTS process.
These are the process. In summary, what I understand is
that if any configuration or customization is required to
solve the issue, then the consultant have to work on DEV
Client, then the end user will test it in the QA client and
after approval the BASIS consultant has to transport it to
the PRODUCTION client.
Is This Answer Correct ? | 61 Yes | 8 No |
Answer / hardik thakkar
A work item should be classified as Production Support based
upon the turn around time to complete it. For example, if a
bug is critical enough to stop the production server, it can
be taken up as a Production Support to resolve it on
immediate basis. Another example of product support type of
work are following:
-Configuration and customization
-User Acceptance Testing
-Database backup
-Clearing of all the data in database
-Changing of name, title, text etc in live working applications
and so on...
Basically if the bug fixing is not so critical and if it can
wait and takes a long time to fix and test it, it should be
ideally classified under Bug Fixing type of work request
instead of Production Support.
Is This Answer Correct ? | 27 Yes | 11 No |
Answer / jishnu jk
Those who work as technical support representative with
engineering background in computer science can shape their
career.
Is This Answer Correct ? | 9 Yes | 7 No |
Which one of the payment mode is more effective, whether of using Partial Payment or Residual Payment in th company for vendor clearing and for why? Plz. give the explanation.
When I am using T.code Me21n for purchase order creation, for example if I am entering a material price with Rs.100 with quantity of 10, and frieght of Rs.10, then my Input tax is calculated on Base amount (i.e Rs.100) But I wanted to change my customization that my Input tax % should be calculated on my Actual price instead of Base amount. Can any one help how to customize it?.
how many normal and special periods will be there in fiscal year why do u use special periods.
down payments..by using t-code -48 i have posted a dp..amt of 160000.while invoice was fully posted..but i cleared it t-code 58 instead of f-44..in fbln1 in still shows open item..give a solution..tq
What is GL accounting in SAP
Is business area at company code level?
Please give me customization setting for FI/Co - CIN?
Do you transfer the master data from development server to production server ?
What is the meaning of 'n' in me22n,me23n,me21n or me29n for P.O purpose.
what are all the challenges you faced in project implementation as a sap fico Consultant? & what are all the challenges you faced in ticketings?
1 Answers Accenture, NTT Data, Sona, TCS,
1) How Many Leavels we can create GL account ?
can any one extplain me about sap fi test script,please?