what is baseline and final configuration. at which steop we
perform it.
Answers were Sorted based on User's Feedback
Answer / madhusudhan
Base line conf. is nothing but creating or defining
indepandant organizational units like saels org,distr
channel,divsion,sales offfices,sales groups and shipping
point and also creating sales documents, deli. doc.,
billing documens and all determination procedures.
Final configuration is nothing but to run a perticular
scenario, in this case u need to integrate with all the
modules to link up with the organisation units and to run
the complete business process like Inquiry to Billing we
will utelize all the baseline configuration settings.
All sd guru's, if iam wrong pls correct me?
Is This Answer Correct ? | 23 Yes | 1 No |
Answer / rangarao
Baseline and Final Configuration carried out at Realization
phase.
In this phase, . The Baseline configuration is designed to
configure about 80% of your daily business transactions and
all of your master data, and organizational structure. The
remaining configuration is done in process-oriented cycles.
The Business Blueprint is used as the guide for the system
configuration, done using the Implementation Guide, which
will be described in detail in this chapter. After this,
data transfer programs, as well as interfaces, need to be
tested.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / srinath bachu
Baseline configuration : this phase priority requirements of the enterprise structure.
during baseline configuration work on process that can be configured with out programming and enhancement.
Final configuration :
in this phase your requirements are met in R/3 systems
final configuration is transportation process that expand the business process
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / manoj samal
The Baseline Configuration is designed to configure about
80% of your daily business transactions and all your master
data, and organizational structure. The remaining
configuration is done in process-oriented cycles. The
Business blueprint is used as the guide for the system
configuration, done using the implementation.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / yogesh bhadane
Base line configuration - It is a configuration which be specific for one 'module' for which we need no depend on other module consultant
Final configuration - It is a configuration for which you need to depend on other module consultant
First you have to complete the base line configuration and then after you have to go for final configuration
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / bachi
baseline confg is one module configaration (ex ; sd ) no need to depend on other module final cong is integration with other modules fi,mm,pp people like
it is in realistion phase in implemention
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / bvr
Base line configuration:
In Base line configuration we should not take the help
of ABAPERS. where as in final preperaton WE take the help
of abapers.
Is This Answer Correct ? | 3 Yes | 5 No |
Answer / santosh reddy
hi,
Base line configeration is nothing just enterprise
configeration only final configeration means on client
system or production server configeration means after all
preperation like cutover, Error testing.. means ready to
use at client side
Is This Answer Correct ? | 2 Yes | 8 No |
is it necessary to learn CRM as a SD consultant? <moderator> Dear chandu, Please post all common enquiries in Forum. </moderator>
how to create T.CODE
I Recently faced the interview in SAP SD.Interviewer asked the what is the serial no in delivery processing?and also what is the pgi?and what is the configuration for packing? and what is the relation between plant and shipping point?
Over head cost controlling component enables you to plan, allocate, control and monitor overhead costs. What are all fall under over head cost controlling?
How Sales Area is determined in Stock Transfer?
What are functional specs? can anyone give a eg. of a functional specification pls.
WHICH DATA IS RELEVANT FOR CREDITING CREDIT AND DEBIT MEMOS??
What is the difference between working in support project and implementation project?
What is work flow ? and what is Price type ? Please reply as soon as possible. Thanks
Hi all, suppose by using Order Combination I have more then one order nos. then I want to create one delivery for those multiple orders. How can I enter multiple order nos. in vl01n screen. please reply as soon as possible. Thanks
Can anyone tell me the link for interview question for SD module. . . As i m fresher so i really need to know what sort of question i will to have face during interviews . . . .
Can One Sales office be assigned to multiple sales areas.If yes how.If not why.Thanks