How to use for pickup termination with external sourcing a different Factory Calendar than used in plant masterdata ?
Answer / volker schubert
following example:
Factory Calendar maintained in plant master data uses 7 workdays per week. For purchasing with incoterm "FCA" we want to use pickup termination, we have maintained the pickup termination in workdays in purchasing SA-items. As our trucks are driving only Monday-Friday we created a separat factory calendar with working days "Monday-Friday". Therefore we maintain this factory calendar in that shipping point, where external GR is posted. But unfortunatly, still the factory calendar from plant masterdata seems to be used.
Is This Answer Correct ? | 0 Yes | 0 No |
Can we change the layout of miro screen? Does it require enhancement?
How does MM-SD integration can be done? Plz. give me details with transaction codes.
How is the vendor return processed without a purchase order reference?
What do you mean by reservation?
What mrp procedures are available in mm-cbp (consumption based planning)?
Give some example of master data in material management (mm).
What is the maximum length of materials master short text? Is it possible to increase it?
How much effort is it going to take to implement?
Explain batches. How would you search them?
What do you mean by the release procedure?
In which condition, "Batch Management" is "deactivated" from material master? Or, why do we deactivate Batch management for a material?
What are the main components of the mm module? How are these components used in sap?