How to use for pickup termination with external sourcing a different Factory Calendar than used in plant masterdata ?
Answer / volker schubert
following example:
Factory Calendar maintained in plant master data uses 7 workdays per week. For purchasing with incoterm "FCA" we want to use pickup termination, we have maintained the pickup termination in workdays in purchasing SA-items. As our trucks are driving only Monday-Friday we created a separat factory calendar with working days "Monday-Friday". Therefore we maintain this factory calendar in that shipping point, where external GR is posted. But unfortunatly, still the factory calendar from plant masterdata seems to be used.
Is This Answer Correct ? | 0 Yes | 0 No |
What is the difference between a contract and a scheduling agreement?
3 Answers Accenture, Cap Gemini, CGI,
What is the difference between LSMW and CATT?
What is the difference between mara and mark?
What if i’m running a much older version?
What is ean?
What do the we101 do?
What are the initial configuration steps for inventory management?
if physicaly checked the stock found zero. hoe to enter stock zero stock
What is an account assignment category in a po document?
what is cbp? What is the difference between cbp and mrp?
What is the function of Profit center in Material master and how will system react when it finds Profit center in MM/when it does not find Profit center in MM? Plz answer for both the scenarios?
Which setting is required in sap to trigger subcontracting purchase requisition automatically through mrp?