What change management functions do you require?
How do you want to define the validity of BOMs (based on
date/freely definable parameters)? Must existing change
histories be transferred to the R/3 System?
No Answer is Posted For this Question
Be the First to Post Answer
Explain the gaps and the steps involved in them.
Different types of scrap or difference between types of scraps.
In lsmw which is the most important step?
What is the difference between stock transport order and stock transfer order?
What happens to plan after it has been converted into production order?
What are different MRP types?
What do we do in realization phase?
How can we shut off the "automatic costing indicator" and the "automatic scheduling indicator" which go on when the production order is released?
What is mrp area and mrp group. tell me differences
What is the planning horizon?
What is mrp procedure
Explain In-process inspection.