What change management functions do you require?
How do you want to define the validity of BOMs (based on
date/freely definable parameters)? Must existing change
histories be transferred to the R/3 System?
Where have we to specify the teardown time in one operation?
What happens to plan after it has been converted into production order?
How the processing time is calculated in a wc when both labor, machine categories exist?
What is the use of plm (product lifecycle management) in sap pp?
What is MRP Profile and MRP Group?
What are all the steps involved in Variant Configuration?
What is planning time fence and where will be reflect
What is meant by payscale structure?
What are gaps? Some examples?
What is planning file entry
Define stock requirement
What are the reports generated in product cost controlling information system?