How does sap know that an operation has components as indicated by the component allocation indicator?
No Answer is Posted For this Question
Be the First to Post Answer
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
while extending the material master view after saving error is coming that the field material number is defined as a required field,it doesnt contain an entry. After selecting that it is showing the particular material may be locked. Pls do the needful.
What is a ‘bom’?
How you get the ticket?
Overlapping and splitting, where do you assign?
how do you transfer postings from FI to Co?
If production order released for 100 pieces you done GR for 50 pieces and technically closed, after some days you can do GR for 50 pieces
What is meant by payscale structure?
What are some important tables used in pp (production planning)?
Why work scheduling view is required for semi-finished and finished products?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
What is golive actually? What is the role of a functional consultant in golive actually?