Mention what is the t-code for changing production order and to display production order?
No Answer is Posted For this Question
Be the First to Post Answer
What is Auto GR?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is meant by payscale structure? How did you configure payscale structure?
What do you mean by pooled capacity?
What is the transaction code to execute forecast, and explain types of forecast model?
• What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling?
Explain In-process inspection.
Can i create Production order without bom and routing ? lakshman
What is the t-code for changing production order and to display production order?
What are the ‘bom categories’ supported by sap?
Product Costing Run is over. Now If I add one more rawmaterial for that material also it has to included & run the cost. But it is not happening?
What is the uses of production scheduling profile and what the configure have you done current project
0 Answers Cognizant, Patanjali Ayurved,