Mention what is the t-code for changing production order and to display production order?
No Answer is Posted For this Question
Be the First to Post Answer
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
what is varient BOM?
In which context do you use bills of material? [ ] Material Requirements Planning [ ] Execute Production [ ] Goods Movements (to Help Data Entry) [ ] Product Costing [ ] Development/Engineering/Design [ ] Documentation [ ] Others
What general data appears on basic data screen?
why their is need of production version
In realization stage what you will do
What is the planning time fence?
Tell some standard order types and what configure done for current project
what do you mean by planning time fence
If process order is technically closed, by mistake I want to process that order again can I do it?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What is planning time fence and where will be reflect