What are the main controls in MRP?
Answers were Sorted based on User's Feedback
Answer / shaik
processing keys ,creation indicators,planning
mode,scheduling,delivery schedules ,
| Is This Answer Correct ? | 7 Yes | 1 No |
Answer / jinchandramule
planning cycle:A cycle in which the planning run is
performed for a material.
If a vendor delivers a material on a particular week day,
it is useful to plan this material according to the same
cycle, while allowing for the delivery time.
Total planning run:
strategy group:
Procurement Type:
Indicator that defines how the material is procured. The
following procurements types are possible:
The material is produced in-house.
The material is procured externally.
The material can be both produced in-house and procured
externally
Scheduling Margin Key for Floats:
Key that the system uses to determine the floats required
for scheduling an order. You define the following floats
with the scheduling margin key:
opening period
float after production (only in the case of in-house
production)
float before production (only in the case of in-house
production)
release period (only in the case of production order
management)
Floats are maintained in workdays.
Consumption mode:
The consumption mode controls the direction on the time
axis in which the system consumes requirements.
Use
In backward consumption, sales orders, dependent
requirements or material reservations consume planned
independent requirements that lie before the requirements
date.
In forward consumption, sales orders, dependent
requirements, or material reservations consume planned
independent requirements that lie after the requirements
date.
Consumption mode
The consumption mode controls the direction on the time
axis in which the system consumes requirements.
Use
In backward consumption, sales orders, dependent
requirements or material reservations consume planned
independent requirements that lie before the requirements
date.
In forward consumption, sales orders, dependent
requirements, or material reservations consume planned
independent requirements that lie after the requirements
date.
Availability Check:
This field has two uses:
1. Specifies whether and how the system checks availability
and generates requirements for materials planning.
2. In Flexible Planning, defines - together with the
checking rule - the different MRP elements that make up
this key figure. The sum of these elements gives the key
figure.
THESE ARE THE MAIN CONTROLS IN MRP
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / nitin thapliyal
The main controls of MRP are
1) MRP type :- eg- PD consider in MRP. ND :- No planning
2) Reorder level:- Indicates the reorder point
3) MRP Controller :- 001- raw ,002- SFG , 003- FG
4) Lot size :- Eg- LOT TO LOT VARY, MB- montly lot size
5) Mixed MRP.
6) Procurment type:- E - In-house production
F External procurement
Blank No procurement
X Both procurement types
7)Saftey Stock
8) Availablity check
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / vijay
1.Processing key
2.Create purchase requestions
3.delivery schedules
4.Create Mrp list
5.planning mode
| Is This Answer Correct ? | 0 Yes | 0 No |
Explain what is “work center” in sap pp and what is the use of data in work centers?
What is serial number and where you will be configure
what is baseline configuration
what are the problems you faced in MRP?
1000 pieces you run mrp on that time use md02 or md01
Can we have more than 6 standard values in standard value key?
How to attach a drawing for a material to bom ? Is it possible ?
Explain Availability check.
Tell some sop
What are the keyfields found in mrp view 1?
What is mrp area and mrp group. tell me differences
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
SAP Basis (1262)
SAP ABAP (3939)
SAPScript (236)
SAP SD (Sales & Distribution) (2717)
SAP MM (Material Management) (912)
SAP QM (Quality Management) (99)
SAP PP (Production Planning) (523)
SAP PM (Plant Maintenance) (252)
SAP PS (Project Systems) (138)
SAP FI-CO (Financial Accounting & Controlling) (2766)
SAP HR (Human Resource Management) (1180)
SAP CRM (Customer Relationship Management) (432)
SAP SRM (Supplier Relationship Management) (132)
SAP APO (Advanced Planner Optimizer) (92)
SAP BW (Business Warehouse) (896)
SAP Business Workflow (72)
SAP Security (597)
SAP Interfaces (74)
SAP Netweaver (282)
SAP ALE IDocs (163)
SAP Business One (110)
SAP BO BOBJ (Business Objects) (388)
SAP CPS (Central Process Scheduling) (14)
SAP GTS (Global Trade Services) (21)
SAP Hybris (132)
SAP HANA (700)
SAP PI (Process Integration) (113)
SAP PO (Process Orchestration) (25)
SAP BI (Business Intelligence) (174)
SAP BPC (Business Planning and Consolidation) (38)
SAP BODS (Business Objects Data Services) (49)
SAP BODI (Business Objects Data Integrator) (26)
SAP Ariba (9)
SAP Fiori (45)
SAP EWM (Extended Warehouse Management) (58)
Sap R/3 (150)
SAP FSCM Financial Supply Chain Management (101)
SAP WM (Warehouse Management) (31)
SAP GRC (Governance Risk and Compliance) (64)
SAP MDM (Master Data Management) (0)
SAP MRS (Multi Resource Scheduling) (0)
SAP ESS MSS (Employee Manager Self Service) (13)
SAP CS (Customer Service) (0)
SAP TRM (Treasury and Risk Management) (0)
SAP Web Dynpro ABAP (198)
SAP IBP (Integrated Business Planning) (0)
SAP OO-ABAP (Object Oriented ABAP) (70)
SAP S/4 HANA Finance (Simple Finance) (143)
SAP FS-CD (Collections and Disbursements) (0)
SAP PLM (Product Lifecycle Management) (0)
SAP SuccessFactors (33)
SAP Vistex (0)
SAP ISR (IS Retail) (28)
SAP IdM (Identity Management) (0)
SAP IM (Investment Management) (0)
SAP UI5 (59)
SAP SCM (Supply Chain Management) (51)
SAP XI (Exchange Infrastructure) (49)
SAP Cloud Platform (34)
SAP Testing (89)
SAP SolMan (Solution Manager) (63)
SAP MaxDB (116)
SAP GUI (15)
SAP AllOther (329)