Answer / dinesh kumar
PSP--- Production Schedulng Profile are set of controls asigned to a Material.
What are the controls
Order Release with the Creation of production order .
Scheduling with the Order Release
Auto Goods Receipt
Capacity Profile
Automatic Batch creation with the Production order for the header material
Order type for the system to select When we convert the PLanned order to Prd order.
These some of the generic controls associated with PSP.
Is This Answer Correct ? | 12 Yes | 0 No |
The production scheduling profile is copied into order from Material master.
It is maintained at Material Master (Work Scheduling tab)
The following controls/actions are maintained against a Production Scheduling Profile during Configuration (SPRO).
1-Various automatic actions can be activated during creation and release of Production order . Example:Production order can be automatically released during creation , no need to release it manually.
2-Availability Check
3-can directly link to a particular order type.
Is This Answer Correct ? | 3 Yes | 0 No |
Mention what is the purpose of using capacity planning?
What is 'work center' in sap pp?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
What is trigger Point. What are the setting required to trigger one action?
What are the details in Production scheduling profile?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
what do you mean by planning time fence
how to define formulas in work center
What are the Important tables in PP, QM?
How can you create production order without routing and BoM?
define variable cost