what would be compressive strength of cube for 7 days if design mix of M15
Why we test compressive strength after 28 days..?
3 Answers NM Caramoan Builders,
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
what is the meaning of W.T.S this is written on structural Drawing
If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
what are the Task work of different labour.?
How much steel required for 1000 sq ft slab 4" thickness.
What is tha cutting lenght off samosa ring in column 300*600.
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
As per ratio 1:4:7, how can we calculate the quantity of materials for 1 cum of concreate, pls derive with equation
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
how to calculate the chair reinforcement length in slabs, footing or anywhere??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)