Answer / pavan
6 Foot * 6 foot* 6 foot ,first convert in to mts
1 foot = 0.3048 mts
so 6 foot = 0.3048*6= 1.828 mts
so 1.828*1.828*1.828=6.11 Cum
according to mix design or nominal mix cement content will be provided per cum.
example if min cement content is 380 kg/cum for m30 grade
6.11 * 380 =2321.80
or 2321/50 = 46.36 bags
Is This Answer Correct ? | 1 Yes | 0 No |
it's depend on which grade concrete we use and what is design mix
when we use m30 then 21 bags of cement we use
if depth of footing is also 6 ft
328kg cement consum in 1cum concrete.
Is This Answer Correct ? | 2 Yes | 2 No |
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
For what purpose bedding is used under storm water drains?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
What are the types of Road in India?
how much quantity of blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork. Size-16"x8"x8". Also what is the cement sand ration commonly used?
10 Answers ACC, CCCL, L&T, MFAR, Shoba Devlopers, SLS Developers,
How to check the quality of cement?
Define different types of roof systems?
a butt weld is specified by
what is the density of compacted earth and jamuna sand
what is the difference between compaction and consolidation?
is there zone 6 for earthquake in india? on what basis the naming of the zones are done in variuos countries?
what"s the formula to find the quantity (consumption) of cement,sand,aggregate for 1m3(1:2:4)?
11 Answers ABB, Construction, Isher, L&T, Saudi Oger, Spectra, Strati,