what is the allowable limit of wastage of cement for RMC at
plant operated manualy
Answers were Sorted based on User's Feedback
Answer / komalvgarg
In site-mixed concrete job, wastage occurs in handling of all materials, including cement. The latter is generally of the order of about 2-3 kg per 50 kg bag of cement. all such wastages are minimized to less than 1% in RMC facility.
Is This Answer Correct ? | 5 Yes | 3 No |
What are the types of Road in India?
What is a hatch patterns?
Rate analysis of Vitrified tile in cement mortor 1:3
0 Answers Design Space, Muthoot Group,
if 6.0M x3.0M Boat floating on water One person Sit on Boat Then the boat Sink about 15cm .Then what is the wt of person.
parts of stair-case?
strenth of brick
how we can find sieve #4 is 4.75mm?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
How do piles bear loads
In block work seawalls what is the purpose of slip joints?
SHEAR FORCE AND BENDING MOMENT DIAGRAMS
beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy columns. any one can give useful information for this issue or related code or websites.