what is the allowable limit of wastage of cement for RMC at
plant operated manualy
Answers were Sorted based on User's Feedback
Answer / komalvgarg
In site-mixed concrete job, wastage occurs in handling of all materials, including cement. The latter is generally of the order of about 2-3 kg per 50 kg bag of cement. all such wastages are minimized to less than 1% in RMC facility.
| Is This Answer Correct ? | 5 Yes | 3 No |
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
give an example for cantilever structure
what is the rate for per sqm damp proof course
the beam size (450x1000) effective length is 19.0mts no intermediate supports and top 8nos 32dia and bot 32dia and condition is stragge lap. it is exceeding lap zones and exceed length of bars?
plz give me the rate of RCC(1cuM), PCC(1 cuM), Brick Work (1sqM)?
11 Answers L&T, Sobha Developers,
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
wha is frog?
Difference between overlap and development length of rod. Thanks.
What is Niminal mix and Design Mix ? write difference between them ?
Explain what is progress payment?
How many square meter can mason layout chb per hour
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)