Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
No Answer is Posted For this Question
Be the First to Post Answer
Explain Flexible planning Procedure?
What are all the steps involved in Variant Configuration?
What are SAP Configuration Steps along with Tcode and Master data for New Product Development and Introduction? Please give step by step answer along with T code for each step and master data and Org. element required for each step. Thanks in advance.
2 Answers Accenture, IBM, TCS,
Integration between PP and MM Module.
what is the consumption based planning ?
2 Answers Gupta Power Infrastructure, Webcom,
Have idea about variant configure
2 Answers Accenture, ASD Lab, Cap Gemini, IBM, Sunbeam,
How do you get the system to update this value from the routing?
while extending the material master view after saving error is coming that the field material number is defined as a required field,it doesnt contain an entry. After selecting that it is showing the particular material may be locked. Pls do the needful.
Without routing we can create production order..?? If yes how....?
How many levels of Flexible Planning are there?
What is scope of planning?
What is MTO & MTS