Answer / pradip chaudhari
MPS means master production scheduling which is used for high cost level material having high value and MRP is used for comparatively low cost level material
Is This Answer Correct ? | 2 Yes | 0 No |
what are the costing parameter ?
what do you mean by planning time horizon
Have you used Pull list or back flushing in REM?
What are sequence, parallel, overlapping, splitting and where can we assign these
Can't one material be assigned to more than one operation in a routing, why?
What is "work center" in sap pp and what is the use of data in work centers?
What is finite scheduling?
Can we create a production order without BOM and Routing?
What is 'work center' in sap pp?
What are the production process in sap?
can any body tell me integration between pp with fi,mm,sd.
What is the need of mrp list if the stock requirement list is already given?