Planning Engineer interview model question and answer
Answer / kumar
should know operation plan, should know outage program,PM & CM schedule,Budget control, Data gathering, create database, documentation, cmms,primavera, ms-office& excel in expertis, 3cs
| Is This Answer Correct ? | 0 Yes | 0 No |
We know primary ,secondary air so, What is the work of Tertiary air in Thermal power plant
Why superheated are started before I'd and rd fan?
What happens if lizard comes in a MOCB
What is the the sequence/logic of burner management system in boilers. What is purging and scavenging?
What will happen if the Air Preheater is placed before the Economiser?
6 Answers Bhel, KSPL, Tata Power,
What will happen if id fan on boiler not functioning?.Can the Boiler run without id fan? What is the effect?
What is wheel chamber in steam turbine?is it impulse blades are called wheel chamber in the steam turbine?
why we use reduction gear box to reduce turbine high rpm to 1500 rpm in small plant
3 Answers Maruti Suzuki, Sail,
LAPT working in alternator / generator
What is critical speed of turbine
What vibration parameters are monitored in a directly coupled single cylinder turbine and generator?
What is difference between Actual Drum Level and Compensated Drum Level?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)