Planning Engineer interview model question and answer
Answer / kumar
should know operation plan, should know outage program,PM & CM schedule,Budget control, Data gathering, create database, documentation, cmms,primavera, ms-office& excel in expertis, 3cs
| Is This Answer Correct ? | 0 Yes | 0 No |
.What do you mean by Turbine Dump.
How to control cooling tower alge
1 Answers GPL, SPY Agro Industries,
Boiler capacity is 5ton, what will be the feed water tank capacity?
11 Answers dscl, Indiabulls, Krest, TCS,
what is the condition of transformer parallel operation ?
Is it not bad to bleed steam from turbine stages before utilizing its energy.
Why cold water is used for Boiler Hydro test
why we use reduction gear box to reduce turbine high rpm to 1500 rpm in small plant
3 Answers Maruti Suzuki, Sail,
what is natural frequency of turbine shaft .
In a thermal power plant ID Fans running with full load but boiler load is only 80 % give reason ?
9 Answers Essar, Prumatech, Tata Power,
why the Steam Turbine(20MW)center line and gear box center line not in same elevation during coupling alignment ?
3 Answers Greenesol Power Systems,
1 TPH how many Megawatt ?
why airtel use + 24 volts and other operators use -48 volt
0 Answers ABC, Airtel, INDUS, Reliance,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)