Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what are all the pre commissioning activities in WTP in
power plant




what are all the pre commissioning activities in WTP in power plant ..

Answer / rajan pandey

Raw water pump should be ready by which we can take
water to creator.proper cleaning of aerator,clariflocculator
And storage tank.Dosing system like alugm Dosing,lime dosing,chlorine
dosing should be commissioned.ReadyNess of flocculator.fitting scrapper
Fitting .isolation gate operations should be cheated

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Power Plant Engineering Interview Questions

procedure of how to generate power in solar plant.

0 Answers  


What will happen if the Air Preheater is placed before the Economiser?

6 Answers   Bhel, KSPL, Tata Power,


what is significance of canister vent in condensate extraction pump & difference between vacuume balancinf line & canister vent

3 Answers   NTPC, Tata Power,


what is interview question for power plant

3 Answers   Emerson, IOCL, SBPIL,


what is IR in differential test on motor?

2 Answers   Adani, Adani Power,


Why attemperation is required in HRSG in a combined cycle power plant?

10 Answers   Tata Power,


What is the the sequence/logic of burner management system in boilers. What is purging and scavenging?

2 Answers  


63.5 ohm NGR is connected with our gas engine genrator running at 500 rpm, 50 hz and synched with WAPDA at 6.3 KV bus voltages, 2500A and 25KA(1 sec). can some one give me proper calculations how it comes 63.5ohm?????

2 Answers   UET,


By seeing a Power house Can we justify the kV of that power house?

1 Answers  


explain why direct on line starting toque and current may not be acceptable

2 Answers   Avon Organics,


why prds line tapping taken from ms line as Pri SH O/L temp & pressure is sufficient to full fill our requirement of PRDS..

3 Answers   GIPCL, OEGI,


We have 132KV/11KV Grid connected power transformer for getting power from Grid. Can we use this transformer for sending generated power as well. I mean step up from 11KV to 132KV and transmit.

6 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)