Answer / rajan pandey

Raw water pump should be ready by which we can take
water to creator.proper cleaning of aerator,clariflocculator
And storage tank.Dosing system like alugm Dosing,lime dosing,chlorine
dosing should be commissioned.ReadyNess of flocculator.fitting scrapper
Fitting .isolation gate operations should be cheated

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Power Plant Engineering Interview Questions

Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

0 Answers  


which safety valve will open first if steam is not been supplied to turbine.

3 Answers   Wartsila,


I want to build 100 megawatt hydel dam. What does mean, 100 MW per hour? then how many electric bulb of 100 Watts the dam would lit?

1 Answers  


difference between vaccum pump and ejector

2 Answers   NTPC, Tata Steel Limited,


if suppose boiler has high heavy tube leakage, so in which time we feed the water in a boiler. can we stop the feed water at particular combustion temperature.

4 Answers  






What is indipendant power plant

2 Answers  


Why superheated are started before I'd and rd fan?

0 Answers   BCPL,


Our 8mw steam turbine (condensing cum extraction) exhaust steam temperature is high even after taken it in hogger why

1 Answers   Bombay Rayon Fashions,


Boiler capacity is 5ton, what will be the feed water tank capacity?

11 Answers   dscl, Indiabulls, Krest, TCS,


why drum level is increased when one of the running coal elevations are suddenly tripped?

6 Answers   APGenco, Vedanta,


what is scanner air fan & how dose it work & is there any interlock in power plant

3 Answers   APGenco,


why do we use contro fluid tank (cft)in turbo generator area(tg) in power plant?

1 Answers   MPL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)