Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


I am opertaing generators which are beyond 14000hrs and now the fuel consumption is about 2kw per liter of diesel. The engines are due for overhauling. is this normal



I am opertaing generators which are beyond 14000hrs and now the fuel consumption is about 2kw per li..

Answer / r.k.

If you want diesel consumption constant then your rpm will reduce result of it your generator will be overloaded so conclusions of that is change regulator section of greater efficiency and rating otherwise if you modify your engineers regulator then change Senegal diode of higher PIV and current rating and also change voltage Divider circuit
Isse ye hoga ki yr altinator ka rotor ki winding me current jyyada Jane lagega or rotor field stronge hoga

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Power Plant Engineering Interview Questions

line safety is not opening but drum safety opens what to do?

3 Answers  


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

0 Answers  


what does mean by kva rating

0 Answers  


In a coal fired boiler furnace temp. is high but super heater out let temp. low what reason for this?

6 Answers   ABB, Essar, Gayatri,


thermal power plants in steam using inlet of turbine.inlet of turbine pressure and flow is same as boiler feedpump why not use direct to turbine?

6 Answers   IBPIL, JSW,


How to decide Heating surface area of boiler on their steam generating capacity?

4 Answers  


1 TPH how many Megawatt ?

5 Answers   Pioneer Labs, PSAL,


what is voltage transformer explain in details

5 Answers   Khulna Power, NCC, Reliance Power,


why we use reduction gear box to reduce turbine high rpm to 1500 rpm in small plant

3 Answers   Maruti Suzuki, Sail,


Need of oxygen dosing in super critical powerplants?

5 Answers  


During shutdown of Steam Turbine,How do we cross the critical speed?

7 Answers   OPG, Power,


What is df/dt protection?, How to calculate setting range of 30 MW steam generator???

1 Answers   DS Sugars, MEMF,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)