Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why oil filled transformers will be with explosion and fire often?



why oil filled transformers will be with explosion and fire often?..

Answer / deng qing

It is my great pleasure to write you because we know that your famous company is the expert in the
power system and its safety control who want a long-terms business doing in this aspect.

If we can ensure you that the futher business can be done like this, could you now work together with us?
✔ virtually possible to synchronise the quality of our TEPFPE (Transformer Explosion Proof and Fire protection Equipment) with the best producer of transformer protector.
✔ give you very competitive prices to enable you to save your money along with a profitable space.
✔ good services providing before and after our sales.
✔ timely shipment with big quantity.

If you think it is workable business, then let me give you some introduction of our TEPFPE, the oil filled transformer (OFT) protector as below:
▲ the existing problem of OFT conditions:
will be with explosion or fire happening after long-term uses or high temperature running and overload uses,if happened,
it will bring you so much losses together affecting your normal power supply system for a long time.
If OFT accident happened that OFT is just like a very big bomb killing peoples and destroying other transformers nearby.
▲ what we can do for you:
1. to supply the H-quality TEFPE to prevent your OFT from these potential risks happening with scientific designing
along with reasonable prices offering like: 10ms decompression and 60m nitrogen injection to completely prevent
OFT from potential risks of explosion and fire happening.
2. to ensure you with no more these accidents happening once TEPFPE well installed beside your OFT.
3. a life-time service providing before and after our sales.
4. our service objects for OFT is ranging from 25MVA to 1000MVA,above and including 135KVA OFT uses whatever
new or old OFT together with big oil storage tanks protection.
5. the detailed introduction of TEFPE where you can find them in the attachments.
5-1: the 3D operational principle (3D presentation) where you can download it from attachment or link to:
http://pan.baidu.com/s/1slx8G6h (no need to download)
5-2. the OFT accidents occured at site show where you can download it from attachment or like to:
http://pan.baidu.com/s/1dFbCwgx (no need to download)
6. if you want to protect new OFT that has not leave the factory, do please send us the Questionary
filled out of it so that we can ask OFT manufacturer to reserve proper interfaces for our pipelines linking of TEPFPE.
7.if you want to protect your old OFT that you can fill out the Questionary in all details so that we can
give it a good designing and matching with your old OFT.
▲ what you can do in the following days:
1. if you are willing to adopt our TEFPE with good matching with your OFT that you can fill out
the Questionary listed in the attachment and telling me,our expert team will soon give you good
designing and relative prices offering on basis of your main ports.
2. mutual visit can be well arranged as per you request to finalize anything details related to this TEPFPE business.
All the technical information and certificates of our TEPFPE where you can download from attachments or 2 video linkings the above shows.

Now I am looking forward to hearing your possitive reply, if something not clear, you can ask me asap.

Thank you once again for your kind cooperation.
Truly yours
Mr.Dneg Qing, G/M
Beijing Zhongruihe Electrical Co.,Ltd
Website: www.bj-zrh.com/en
M/P and WhatsApp: +86 13011214100 (easy connection)
Email: dengq@bj-zrh.com

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Power Plant Engineering Interview Questions

How to decide Heating surface area of boiler on their steam generating capacity?

4 Answers  


whats plant?

1 Answers   Bhavini,


operation

0 Answers  


why do we use contro fluid tank (cft)in turbo generator area(tg) in power plant?

1 Answers   MPL,


what is actual CAL MODE & cal means?

2 Answers   GIPCL,


Can any one advised me how we can measure the losses in a 11kV/415v power transformer? We have no access to the incoming mains into the primary of the transformer. Can one derive something useful by measuring temperature rise in the transformer?

1 Answers   Dexdyne,


what is scanner air fan & how dose it work & is there any interlock in power plant

3 Answers   APGenco,


why not maintain Ph 7.0 in Boiler because 7 Ph is not acidic and not basic.

4 Answers   Atlas Power,


Difference between directional earth fault and non-directional earth fault

2 Answers  


Why reheater is not used after IP turbine.

3 Answers   Hindalco, SEC,


What is A.T.T.?

4 Answers  


Need of oxygen dosing in super critical powerplants?

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)