Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why neutral has to switch on-off with phase in TN IT TT systems i.e neutral should be taken as fourth pole



Why neutral has to switch on-off with phase in TN IT TT systems i.e neutral should be taken as fourt..

Answer / k.prakashchandra

As a safety measure , the tr is completely isolated

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

Dear friends I want to design busbar for1600 kva transformer(i.e2100 amps) what are all the factors to be considered before selectinga busbar what are all the standard sizes of busbars what is the formula for finding current of copper and aluminium busbar

0 Answers  


11kv/433v delta/star distribution transformer primary side full load Ht current is 83.33A in , but input side VCB rating 800A.why?

0 Answers  


Can the field winding in synchronous machines be placed on stator?What is the limitation of such arrangement?

2 Answers  


what is LOS(line of sight)?

1 Answers  


Sparking occur when a load is switched off because the circuit has high – a.) Inductance b.) Capacitance c.) Resistance d.) None

3 Answers   Ecil,


why do we generate only 3ph ac?is it possible to generate 4ph,5ph,....?

6 Answers   Accenture, Bhel, Reliance,


What does the term “voltage regulation” means?

0 Answers  


can any one help me out by posting something related to rvnl interview for site engineer electrical.? what is the procedure? what kinda question they ask us? how long the interview goes? and any tips? and any thing you want to share?

0 Answers  


why we are using DC violtage for testing of cables....which is used in HV AC applicatons...

1 Answers  


In Transformer testing at Shop test we normally test for vector group, open ckt.,short ckt. but what are the other test performed for transformer once it reaches at site.For e.g:if the transformer is dry having rating 1000KVA?

2 Answers  


what is model question rrb junior engineer electrical gr.II

0 Answers  


what are the uses and applications of rectifiers?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)