How to estimate the shuttering material requirement for a slab and beam and shear wall..?
Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
No Answer is Posted For this Question
Be the First to Post Answer
Used Cement Mortar, Cement & Sand in 1 Square Meter or 1 Square Feet For 10-18mm Thick Plaster ? (1:6) (1:4)(1:3)
Would you cause a 55-gallon drum of water to weigh more by climbing in?
how to find the quantity of materials required for constructing a wall of length 10*5*.2m?
sir my site not availabele 12mm steel now if i use 10 mm how many spacing require for slab design slab thk 200mm footing, column,raft,wall how can calculate give me formula
what is the formula for calculating volume of isolated footing? i am not asking for the sloped footing, i am asking for normal rectangle isolated footing, pls add diagram or linkof diagram with answere
What is the difference between NP2 and NP3 Class RCC Hume Pipes
5 Answers Honest Derivatives Pvt. Ltd, Indian Hume Pipe Co, M2K,
Whats the difference between uniaxial column
who much should be the lap length in reinfocement
1)How to calculate concrete cube testing load by area in mpa 2) in kg/cme also
What is the maxi. percentage of steel in compression memeber of C/s area & what is minimum dia for compression member as per IS 456:2000?
if any chance to getting a set of solved major building estimate with the drawing.(soft copy)
what is meant by hidden beam & purpose of hidden beam
2 Answers Carwell Construction, NTDC,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)