how much steel is required for 1 sqft of slab

Answers were Sorted based on User's Feedback



how much steel is required for 1 sqft of slab..

Answer / guest

Renforcements for R.C slabs works

( 40 to 80 kg/m^3 )

Steel reguirement for 1 sqft of R.C slab

1.25 to 2 kg/ft^2

Is This Answer Correct ?    17 Yes 0 No

how much steel is required for 1 sqft of slab..

Answer / janardhan malepati

yes 2.0 kg per sft. in Hi-raised apartments may be it will
2.5 to 3.0 kg per sft.

Is This Answer Correct ?    10 Yes 0 No

how much steel is required for 1 sqft of slab..

Answer / k janardhan reddy

It's 2.4kg per SQft

Is This Answer Correct ?    3 Yes 2 No

how much steel is required for 1 sqft of slab..

Answer / deva

2.5 to 3.0kg

Is This Answer Correct ?    1 Yes 0 No

how much steel is required for 1 sqft of slab..

Answer / sahilshah.civil@gmail.com

6 to 7 kg/sq ft for superstructure
4 to 5 kg/sq ft for podium

Is This Answer Correct ?    0 Yes 1 No

how much steel is required for 1 sqft of slab..

Answer / shalender kumar

70 kg/m3

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

if L*B*H = 20 then direct no of bricks =20 *500

2 Answers   L&T,


What is the difference between oneway slab and twoway slabs

2 Answers  


what is a moment connection and shear connection ? where it provided ? why it provided ?

1 Answers  


what is the clear cover for shearwall?

0 Answers  


what is the IS code no. for concrete wastage?

0 Answers  






what is zero slump concrete

5 Answers  


How may digree of freedon in four bar chain.

1 Answers  


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

0 Answers  


What is difference between limit state and working stress method? How it is applies in building structure.

2 Answers   L&T,


Can we use 16mm dia bar in place of 12mm dia bar in COLUMNS? (if given dia bar is not available on site)

5 Answers   Clover, Rites,


How much quantity plaster area 100 sqf ,redho 1:6,plaster 15mm

3 Answers  


what in total station list counting

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)