The difference between Centering & Shuttering is –––
Answers were Sorted based on User's Feedback
Answer / shashank
CENTRING AND SHUTTERING ARE ONE AND THE SAME , MOST OF THE
LOCAL CONTRACTOR USE CENTRING & THE CONSTRUCTION COMPANIES
USES THE WORD SHUTTERING INCLUDES FORM WORK STAGGING ETC
| Is This Answer Correct ? | 12 Yes | 1 No |
Answer / adesh kumar dohare
Generally Centering is used in local language of Form work for slab and Beam casting purpose and But which form work used in purpose of casting of different structure i.e. Slab/Beam/Column and other Structures htat is known as shuttering.
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / karunanithi
centering means both barbending &formwork
shuttering means only form work
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / amar kantak
CENTERING IS FOR VERTICAL PILLARS & SHUTTERING IS FOR
HORIZONTAL BEAMS
| Is This Answer Correct ? | 3 Yes | 6 No |
Answer / roni paul
Centering term is used for Curve portions...
and shuttering term is used for Horizontal portions...
| Is This Answer Correct ? | 1 Yes | 6 No |
Answer / s jaikumar
Centering is used for columns and shuttering is used for slabs and horizontal beams
| Is This Answer Correct ? | 0 Yes | 6 No |
HOW to calculate Rate analysis of M15 GRADE DESIGN MIX RATIO 1:2.5:5 WITH 40MM Size aggregates for 1 cumtr.
Drar the reinforcement detailing of Internal Hinge ?
How many cement bags of 50Kgs will be required for 2600sqft terrace with thickness of 5".
importance of the soundness test to determine the quality of cement use for any construction
How we decide the type of footing?
what is conrete grade ,how are depent on concrete grad and size of concrete?
Why we add salt in silt content test of sand? Full reason ?
How do you measure water flowing through 300mm diameter pipes?
tell me height of colum casting if slab height 3mtr beam thikness 500mm and slab thik 150mm please write formula sir
14. List 3 of your strongest points as a worker?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)