questions with answers to face an interview of an civil
engineer regarding RCC buidings
No Answer is Posted For this Question
Be the First to Post Answer
How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
WHICH IS BETTER,BURNT BRICKS OR SOLID BLOCK IN CEMENT MORTAR
what is concrete
Rate analysis of painting
How do we calculate the building footing calculation ?
what is the clear cover for shearwall?
how many types of hydraulic coefficints and their values
Which is the most prominent tower of world?
How to check percentage of bulkage of sand in RCC?
1 liter emulsion paint covered how much area?
17 Answers Asian Alliance Insurance, Aspirtek, DEWA, L&T,
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)