WHY DO YOU WANT TO WORK HERE?
Answers were Sorted based on User's Feedback
Answer / bhaskar
I THOUGHT THAT UR COMPANY IS THE BEST PLATFORM FOR ME TO PROVE
WAT I CAN DO IN THE FIELD OF CIVIL ENGG.
Is This Answer Correct ? | 15 Yes | 0 No |
Answer / p.chandrashekhar
I know better that i do better work here as compare to
other place.
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / vinod sharma
I want to be profesionaly civil engineer with communication
skill
Is This Answer Correct ? | 3 Yes | 3 No |
Answer / prithviraj rajukar
Coz i know your company needs me....
Is This Answer Correct ? | 2 Yes | 6 No |
limit value of bulking of sand
if we get water mor from 28 days to the rcc concret is this better or have a damag
How much percent dry volume consider for concrete
in plate load test what is the thickness of plate 20mm 5mm 50mm none
WHICH ONE IS THE ECONOMICAL CONSTRUCTION SOLID BLOCK CONSTRUCTION OR BRICK CONSTRUCTION?
can u use instead of water milk for concreting
For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is
we are use us steel in PQC road
How many bricks,sand,cement in 1m3 bricks masonary
3 Answers Ascent, Superior Hi Tech,
how to calculate steel in slabs ?
what affect on the structure and related beam of slab when provide one way slab insteade of two way slab
What"s mean by water bound macadam road(WBM)?