How should i calculate Cutting length of haunch bar in a raft including cover?
Answers were Sorted based on User's Feedback
Answer / er rajkumar
it s deponding on heigt of hans bayr for ex. heigt 300 lenght 400 then 500 ans
300+400+500=1200
and hook 50+50=100
=1300
Is This Answer Correct ? | 5 Yes | 32 No |
what are the volumes of soil stabilization mix of cement,lime and sand in the ratio of 1:1:10 respectively in 1m3?
200sq.ft of slab and thickness is 6" in that how much cement are required(bags), sand & aggregates are in cu.m, choose grade of concrete is m20.
What is bmc stands for in bmc software?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
Unit weight of brick? Sand? Aggregate? Steel? Cement? Water?
28 Answers Aliens Group, Cemplex, DLF, L&T, LBC, Power Trade Engineering, Vishnu, VKM,
In barbending schedule why is o.42*D is taken. Means why o.42 only???
how to find number of 16mm bar reqired for 5m length with 125 mm spacing ?
how to find quantity of total concrete, cement bags and sand. for any ratio
how many nails required in one sqm shuttering.
1 Answers BCL, Era Infra Engineering, KR Traders, Sai Foundations,
What should be the Min.Penetration in a hard rock for all pile diameteres?
usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?
how we can calculate the quantity of sand & cement & also Aggregate so give me to this answer for a slab Length is : 25' /3.28 = 7.62 Mtr Width is : 30' /3.28 = 9.14 Mtr Depth is : 0.6"/3.28 = 0.15 2Mtr