How should i calculate Cutting length of haunch bar in a raft including cover?
Answer Posted / er rajkumar
it s deponding on heigt of hans bayr for ex. heigt 300 lenght 400 then 500 ans
300+400+500=1200
and hook 50+50=100
=1300
| Is This Answer Correct ? | 5 Yes | 32 No |
Post New Answer View All Answers
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
Reinforcement details at hinged joint
Test procedure of fly ash bricks as per code ?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
The mixture of different ingredients of cement is burnt at?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
what is the weight of 6000 psi concrete in lb/cft?
what is modular brick and it size
Prepare a Schedule for a Highrised building from starting stage to Handover?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
What is the difference between 53 grade and 43 grade cement
What is chemical composion test
what is conrete grade ,how are depent on concrete grad and size of concrete?