How should i calculate Cutting length of haunch bar in a raft including cover?

Answer Posted / er rajkumar

it s deponding on heigt of hans bayr for ex. heigt 300 lenght 400 then 500 ans
300+400+500=1200
and hook 50+50=100
=1300

Is This Answer Correct ?    5 Yes 32 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

IS code for Rolling Margin of steel

1916


What do you mean by honeycomb in concrete?

714


What is the yield of 100 litres of water and 10 kg of cement in grout mix?

1589


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2042


The definition of national highway

1343






Give me an example of a time when something you tried to accomplish and failed.

2497


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2028


1:4:8 pcc calculation 591 cu.ft

1808


what do you understand by M25 concrete

1932


in the construction of residential building what type of tank are used?where?why & what is its purpose?

1913


What things architect have to take care of before starting any project?

753


What are the different types of civil engineering?

653


hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?

1970


what is Short bored pile foundation.

2201


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2058