In barbending schedule why is o.42*D is taken. Means why o.42 only???
Answer / arghya das
that is 1.42d-d=0.42d
(1.42d comes from 1/sin45) 45 degree crank bar.
| Is This Answer Correct ? | 4 Yes | 0 No |
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
How much cement+aggregate+sand will be required for making K 150 ready mix for 1 CBM. Strength of Concrete is not mentioned only detail is K150, what i understand of K150 is the weight of cement and what does kg/m3 means.What will be the design for K300 concrete.
how do we design mix ratio?
diffrence between mjb & mnb
what is the formula for Mass of cement grout (Dg)=???
wat is meant by aerocon bricks?
how to do reconciliation of steel
sir, whitch is the best book (writer name) for prepration of gate....
what is stress?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
what is thumb rule for calculating the size of ISMB required for a particular length of span
Given a selection of 28 day cube test results for concrete placed of design mix C 35 and not all of which are greater then 35 MPa, how does one decide if the concrete in place is satisfactory. Are there a minimum number of cubes that need to be tested to decide that?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)