In barbending schedule why is o.42*D is taken. Means why o.42 only???
Answer / arghya das
that is 1.42d-d=0.42d
(1.42d comes from 1/sin45) 45 degree crank bar.
Is This Answer Correct ? | 4 Yes | 0 No |
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
how to nfind out the specific gravity of sand.aggregate,water please help...
Whats the difference between uniaxial column
When column of building is abutting the boundary line,then suitable footing advised is
if we have water only for hydration of cement,no water is available for curing of concrete.then how we can do curing of concrete
as per is code, what is the minimum content of opc and ppc cement for rcc structure
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
how many Concrete hollow blocks (6"x8"x16") will one mason and one helper accomplish/Install a day (8 hrs/day)?
5 Answers Gabriel Construction,
1 cu.m contain how many hollow & solid bricks?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
what is the basic idea of well sinking????
1 Answers Quality Water Management Systems, Simplex, Sobha Developers,
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8