In barbending schedule why is o.42*D is taken. Means why o.42 only???
Answer / arghya das
that is 1.42d-d=0.42d
(1.42d comes from 1/sin45) 45 degree crank bar.
Is This Answer Correct ? | 4 Yes | 0 No |
sir i have 2700sq.ft area.i wish to make a coomercial space including this area.sir what could be the estimated cost of 3 story bulding in varanasi.
Why the height of the bridges over the river are very low?
What are the different approaches in designing the floors of the service reservoirs?
what is westage % for steel, concrete,tiles,pains as per indian staderd code?
6 Answers DLF, Engineering, Lodha, Tata Steel Limited,
quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above
Difference b/w tor steel or tmt bar
How many different between estimated quantity and practical work at site.
What is the unit weight if concrete?.
28 Answers Doshion, HCC, Jindal, KKR, RCL, Simplex, TCS,
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
A person feels comfort when downs a stair because of ––
what will be the lap length of column reinforcement in case of welded lap
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?