If MRP type PD/ND in material master how will work flow.?
Answers were Sorted based on User's Feedback
Answer / sash
PD : Relevance of material requirement planning.
ND : Not Relevance of material requirement planning.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / azhar
In MRP type PD material behave production and sales and
in ND the material behave mm flow
Is This Answer Correct ? | 0 Yes | 8 No |
What are the reports generated in product cost controlling information system?
What is Inspection Points?
How to create plant?
2 Answers GPIL, Yash Technologies,
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
Do you have products with a large number of variants? Do you need Variant Configuration?
What is Schedule Margin key. How floats works in scheduling?
Explain Flexible planning Procedure?
Explain what is sap pp?
How did you configure the payscale structure?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
what is the diff. between NETCH,NETPL AND NEUPL
Why is work scheduling required for semi finished and finished products?