If MRP type PD/ND in material master how will work flow.?
Answer Posted / azhar
In MRP type PD material behave production and sales and
in ND the material behave mm flow
| Is This Answer Correct ? | 0 Yes | 8 No |
Post New Answer View All Answers
What is opening period?
Explain Flexible planning Procedure?
Difference between plan cost, Actual cost and target cost.
What is the data you give in SOP
What is MRP Profile and MRP Group?
What is time phased Planning?
Why work scheduling view is required for semi-finished and finished products?
Explain the mrp controller and their uses.
Explain customer Independent requirement .
list the important tables used in pp.
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
define variable cost
Define gaps.
What are all the steps involved in Variant Configuration?
What is the use of mrp group?