If MRP type PD/ND in material master how will work flow.?
Answer Posted / sash
PD : Relevance of material requirement planning.
ND : Not Relevance of material requirement planning.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What do we do in the realization phase?
What is the recruitment cycle?
What is MRP procedure
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
What is the use of stock requirement list?
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
List out the activities carried out in production planning?
If u maintain sub-contacting where and how will be reflect
What is planned consumption and unplanned consumption?
How to delete a group of products that was created in screen mc84 ?
How to create prt master records?
Explain about rough cut planning
What are all the settings done for configuring the integration of pp with fico?
What is testing & explain standard testing
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?