Why is DPC not provided at sills of doors?
Answers were Sorted based on User's Feedback
Dpc is used for protect from damp, as in door position brick work is not provide for opening, for this DPC is not Provided.
Is This Answer Correct ? | 11 Yes | 2 No |
Answer / maxi moin
DPC is provided for prevent the brick wall from comin moisture from foundation and plinth. So it is prevent from dampness
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / ravi
bcoz its provided for the dmapness which comes from soil moisture or ground water.
Is This Answer Correct ? | 2 Yes | 4 No |
How to Calculate in measurement RCC Colo um Spred design for Billing
how much % of cement can be replaced by flyash ....
which type of instrument included in plumbing work?name of instrument?
where lap is provided in colom?
can u use instead of water milk for concreting
what is the percentage of tolerance in the steel bars
What is meant by engineering drawing?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
rate analysis,what is PERT, TMT ,UPVC
What is pre-stressed concrete?
what is the crushing strength of stone and bricks?
2 Answers DFCCIL, FWO, Habib Group, HBL, KPSC Kerala Public Service Commission, Mott MacDonald,
how many blocks will come per 1 meeter squear