i want measure water capacity in 25'diameter and 7'height of water in circular storage tank in liters how?
Answers were Sorted based on User's Feedback
Answer / santosh singh
volume of cylinder = 22/7 x radius2 x height
this gives volume in cubic metres
multyply by 1000 to get volume in litres
if your dimensions are in feet convert it to metres
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / mandamalaki
22/7*12.5*12.5*7=3437.49 cft
convert cft in to cum
3437.49/35.314=97.34 cum
one cum = 1000lit
97.34*1000=97340 lit.
| Is This Answer Correct ? | 3 Yes | 0 No |
=3.14*12.5*12.5*7
=3434.3 cubic feet
=3434.3 *27
=92812.5 litres
| Is This Answer Correct ? | 4 Yes | 3 No |
Answer / mughalsab
22/7*d*d/4 x h then multiply with 28.316
note 1cft=28.316 liters
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / vikas p
Use Formula for cylinder volume=∏r2h = 3.14 X square(((25/2)/3.28)) X (7/3.28) = answer
value of pi ∏=3.14
Multiply the answer with 1000 you will get total volume of water in Ltrs.
| Is This Answer Correct ? | 1 Yes | 0 No |
To find volume
=22/7 * r *r*h
=22/7 * 12.5 *12.5*7
=3437.5 cubic feet
to convert into litres
= 3437.5 * 27
=92815.5 litres =93000litres
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / venkatesh
Dia of cylinder =25 feet
Height of cylinder=7 feet
Area of cylinder = 3.142*25*25/4=490.93
Volume of cylinder=490.93*7=3436.25 cft=97.3 cum
say 97311.7 lts
| Is This Answer Correct ? | 0 Yes | 0 No |
how to calculate number of bitumen for road asphalt
how do we design mix ratio?
How many times one TMT bars bents & straight upto not broken the bar.
what is the percentage of silt in black cotton soil.?
1) is maximum size of aggregate ristricted to 20 mm for M- 50 grade concrete? If yess or no code the authority?
koi bta sakta ha ka steel ko calculate krna ka full mathod pls
Materials datas like cement sand steel brick 20&40mm aggregate required per sqft of building?
brick work 1cum kitne cft hote hai
What are the types of concrete
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
Why are we providing crank in beam? Thanks.
is there any information regarding MPSC2010
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)