What is standard sand?
What is coarse & fine sand?
What is foundation?
What is the seze of hooks in various Reinforced section?
What is the formula of providing clear cover?
What is the basic diff. between working stress & Limit
state design?
What is &cbc and fck?
what are the primary & secondary test of water purification?
Answers were Sorted based on User's Feedback
Answer / sjtbehera
Standard sand means which obtained from nature, like river
sand
According to IS code sand which passes lower than 4.75mm
and above 600milimicron and fine sand which passes 600 mili
micro and retained 75 mili micron.
Foundation is the part of structure which transfer load of
the structure to the base of soil on which it rests.
hooks- semicircular secn.-16d
90' bend- 8d
45' bend- 12d
Clear cover- column-40mm
BEAM - 25MM
SLAB - 15MM
FOOTING - 50MM
lIMIT STATE DESIGN- in this method design based on limit
state concept, the structure shall be designed to with
stand safety of all loads liable on it throughout its life.
it also satisfy the serviciablity recquirments such as
limitation on deflection and cracking. the acceptable limit
for the safety and serviciable recquirment before failure
occurs is called limit state.
working stress- when limit state design are not acceptable
working stress method is used. in this method is based on
elastic theory.
cbc- compressive strength
fck- charterstics strength
| Is This Answer Correct ? | 60 Yes | 10 No |
as standard sand we can uesd madras sand it is clean,well
graded,wthite,
sand which in retain on 4.6 mm in called coarsed sand
and retain on 2.36 mm is called fine sand
generaly clear cover is based on max. size of aggregate
which is uesd for concreating work see is 456
ph volue is carried on water
| Is This Answer Correct ? | 9 Yes | 13 No |
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
Please can anybody let me know how to calculate cement, sand & aggregete content for one meter cube of concrete. please if possible provide calculations for cement in no. of bags, sand & aggregate in cu.mt. Thanks.
what mean By core Billing
how to the steel dia without using d2/162
How to find beam R/F cutting length
what is difference between GTS bench mark and temporary bench mark
can any one explain bar bending schedule of bems and columns and slabs ??
how to calculate testing date
different types of footing. and difference between footing and foundation
I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this.?
Doul Bar reinforcement and details of drawing.
0 Answers Atlanta Infrastructure,
Is there any possibility of changing in dia of bar from lower to higher (i.e Lower dia bar at bottom and Higher dia bar at top)
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)