how to find the cement and sand quantity for wall plastering
Answer / er.ssmanian007@gmail.com
plaster = suppose 12mm palster
consider 1 sqm ratio is 1:6
volume of concrete= .012x1= .012cum ( per 1sqm)
incrase 20% for joint, filling and wastage=.012*20%=.0144
calculate 1/3rd of mortar when
dry= .0144*1/3+.0144= .0192cum
summation of ratio = 7
cement= .0192/7=.00274cum
= .0789bags
sand= .00274*6=.0164cum
this formula applied for 6mm and 20mm
| Is This Answer Correct ? | 3 Yes | 0 No |
what will be hook length of stirrups
m-25
How much binding wire required in 1 MT Reinforcement? How much Nails Required in 1 Sqmtr Area work progressed
How do you calculate qty for form work like props shuttering sheet and acro span for residential block ? for Example: 10 sq mt what is the material and qty require to do form work.
how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?
Difference between lateral ties and stirrups?
distinguish between under reinforced and over reinforced beams?
what"s the responsibilities for QC(quality controler)in high rise buildings?
How to calculate strirubs hook length? one of my friend said unit of steel*dia of steel*no of bend=hook length is correct r wronge
how i can tak Quantity of mortar in block work
How many cement bags of 50Kgs will be required for 2600sqft terrace with thickness of 5".
how much 20 mm metal is used in M25 grade desin mix in weight and sand for 1 cubic metre
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)