Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


100mm block work 64 bags of cement used
150mm block work 286 bags of cement used
200mm block work 20 bags of cement used
patly work (M15) 293 bags of cement used
mortar ratio is 1:5
how to calculate volume of sand in cum & no. of bags


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)

0 Answers  


why elongation index is not required for concreteing coarse aggregate..

2 Answers  


When column of building is abutting the boundary line,then suitable footing advised is

0 Answers  


what is zero slump concrete

5 Answers  


What is the unit weight if concrete?.

28 Answers   Doshion, HCC, Jindal, KKR, RCL, Simplex, TCS,


what is the least count of staff ?

12 Answers   CCCL, UltraTech,


IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI

0 Answers  


HOW TO DETERMINE FOUNDATION DEPTH OF A MULTYSTORIED BUILDING. IS THERE ANY OTHER FORMULA EXCEPT RANKINE'S MINIMUM DEPTH FORMULA.

1 Answers  


what is meant by csr in foundation? what is sbc?what is meant by contour line?

0 Answers  


what are RIB slabs explain about it

0 Answers   L&T, NCC,


what is the curing time for plastring (all)?

2 Answers  


What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.

1 Answers   AKM Construction Management,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)