Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to find the cement and sand quantity for wall plastering

Answer Posted / er.ssmanian007@gmail.com

plaster = suppose 12mm palster
consider 1 sqm ratio is 1:6
volume of concrete= .012x1= .012cum ( per 1sqm)
incrase 20% for joint, filling and wastage=.012*20%=.0144




calculate 1/3rd of mortar when 
dry= .0144*1/3+.0144= .0192cum


summation of ratio = 7 
cement= .0192/7=.00274cum 
= .0789bags
sand= .00274*6=.0164cum


this formula applied for 6mm and 20mm 

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the causes of building collapse?

1111


Why nautical mile is different from statute mile?

1205


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

2316


How can you produce desired alloys and discuss their applications in daily life.

1158


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

2060


how many running meters in one kilogram of 4mm pvc coated chainlink fencing

1034


where i can get material costs on weekly basis

2113


TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?

2107


What are the alternate material for steel, Sand and aggregate

2315


How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

2027


What is construction mitigation management?

2272


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2212


What is change order request?

1053


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

1750


will fix foundation bolts at site with out template is there any procedure?

2572