Answer Posted / nadira abedin
1:2:4,1:3:6,1:1.5:3
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
Explain what is progress payment?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
what is moment-curvature relationship in semi rigid connections??
what is the mode of method of face bar measurement
how to calculate the length diamond shaped striupps in column
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What is the per cu. mt. price of ready mix in Gujarat region.?
how to calibrate the RM 800
How does a traffic light signal work ?
Describe Briefly The Various Methods Of Concrete Curing?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
cause of cylinder test failure
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
What is .Dwg?
Basic questions of civil engineering