Answer / chandrakant sidusare
To prepare the full strength of concrete and removing the porosity from concrete
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / dinesh koli
To get maximum density of concrete and to remove air and porosity from concrete
Is This Answer Correct ? | 2 Yes | 1 No |
how much binding wire is reqd for 1 MT
Which IS code is saying the detail of deshuttering period?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.
A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?
how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?
31 Answers ABES Engineering College, Gammon, Jalanidhi, NCC,
what is meant by velocity & gravity ?what is the difference between normal liquid flow & gravity liquid flow ?
Explain moment of inertia and its importance.
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
How to calculate crank length? How to calculate hook length?
where are using of one way slab ?
What are the advantages of Prestressed Concrete