How to arrive d*d/162 , for finding the kg per meter , wt of steel
No Answer is Posted For this Question
Be the First to Post Answer
how to consider the laping length of steel?
What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??
3 Answers GKC Projects Limited GKCPL,
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
Which foundation is stronger, Pile or Standard?
Explain moment of inertia and its importance.
What is the procedure of Waterproofing in toilet sunken area ?
can any one tell me how to estimate the reforcement of circular slab and also for dome.
What is point of contraflexure ?
What is BDF flooring?
what is slump
5 Answers JMC Projects, Puravankara,
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
what is levelling staff least count
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)