Answer Posted / adesh kumar
The ratio of R C C work has to be following mix proportion, that is nominal mix:
Cement:Sand:Aggregate-
M 15(1:2:4),
M 20(1:1:5:3),
M 25(1:1:3)
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how to calculate number of bitumen for road asphalt
how to determine H- zone in a column? where it will occur?
60-70 grade of Bitumen is VG-30 ?
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
Aptitude, reasoning, quants, verbal and technical question
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
what is E
What is the Null Point of chimney in Power Plant
what discoveries did you have in relation to your course?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
how gradation of aggregates effect on slump of fresh concrete?
How to calculate Volume of Wet cement concrete for a specific grade?
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?