What is the configuration done for Order type dependent parameter and confirmation parameter
Answers were Sorted based on User's Feedback
Maintain parameters for routing selection, Operation & BOM Application. And in Implementation view activate status change documents, update shopfloor information system & documentation of goods movements, as per your requirement and in controlling view maintain costing variants & result analysis key and default rule.
OPL8
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / a
it also maintain
1) production version selection(manual/automatic)
2)routing type(only routing)
3)status change document
4) shop floor information
5)documentation of goods movement
6)cost accounting
Is This Answer Correct ? | 0 Yes | 0 No |
Explain the Difference between the Discreet and REM.
Explain the gaps and the steps involved in them.
Explain how can you create production order without routing and bom?
Integration between PP and QM Module.
What is mrp controller means?
Difference between plan cost, Actual cost and target cost.
In SAP PP,how do you have relation with end users?
Tell some standard order types and what configure done for current project
Explain what happens to planned after it has been converted into production order?
Explain what is the need of mrp list if the stock requirement list is already given?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
Explain In-process inspection.