What is the configuration done for Order type dependent parameter and confirmation parameter
Answer Posted / a
it also maintain
1) production version selection(manual/automatic)
2)routing type(only routing)
3)status change document
4) shop floor information
5)documentation of goods movement
6)cost accounting
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how many times pcc can run for one material?
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
What is the use of data in work centers?
What is alternative BOM, or diff between BOM group and Group BOM?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
Explain the Difference between the Discreet and REM.
what are Standard keys
what do you mean by opening periods
What is the data you give in SOP
What is detail scheduling
How to move to the realization phase?
What is the difference between pp and pp-pi? Which one is better and how ?
Scheduling times can be defined in the material master record by?
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
Define stock requirement