i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
Answer Posted / tim_coorgi
We have to define MRP storage location indicator as 1 for that storage location.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is routing in sap pp?
What is planning horizon?
What is the SPRO Path for requirement class and req. type?
Explain how ‘pp’ is ‘integrated’ with other modules?
Mention what are the keyfields found in mrp view 1?
Tell some standard order types and what configure done for current project
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is qualification deficiency? How will you come to know that a person does not have certain skills/qualification?
Which tool you are using
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
How mrp (material requirement planning) types are classified?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
How many levels of Flexible Planning are there?