How do you get the system to update this value from the routing?
No Answer is Posted For this Question
Be the First to Post Answer
Once the Production order is created, how to change the BOM and routing in that order?
how many times pcc can run for one material?
Different types of Object Dependencies.
In cost controlling information system mention the fields that are listed in the list screen of the report?
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
Tell me deferent MRP types
What is Inspection Points?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
If I need to maintain a PP module in SAP from the information received from another system, Can i use a table to create the data required for creating the PP
1. how Product Cost Collector Works? 2. What are the master data for MRP? 3. In a production order without making goods issue, i should not be able to do goods receipt. How do we do it? 4. i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done. 5. for in-house production, planned order are generated & for external procurement purchase requisition. i want, system will go in external procurement to a particular vendor. what is the setting? 6. what are the problems you faced in MRP?
What is REM or What is REM profile
What parameters you maintain in “plant parameters” in configuration?