how many stones require for rr masonery work 1cum.
Answers were Sorted based on User's Feedback
Answer / santosh singh
For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work
Is This Answer Correct ? | 24 Yes | 2 No |
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
is basic cost of the material includes tax?
which is the cheapest type of temporary flooring(say for using 6 months on)?
what is the mode of method of face bar measurement
for assembly supported beam main bar are provided at ?
How we can calculate the quantity of sand, & cement, & also aggregate for a slab. Length 25'/3.28 = 7.62 Mtr width 20'/3.28 = 6.09 Mtr depth 6" /3.28 = 0.152 Mtr
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
what is formwork in construction
Concrete Mix designs for M15,M20,M25,M30 and M35
23 Answers Arelgee Consultants, ATCO, Fusion, Gammon, Power Cable, Raushan Engineers, Simplex,
What is different type of bills?
what is castigliano theaorem
W mm mix rasio