how many stones require for rr masonery work 1cum.
Answers were Sorted based on User's Feedback
Answer / santosh singh
For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work
| Is This Answer Correct ? | 24 Yes | 2 No |
why in india readymade structure is impossible in residence houses?
how much anti termite treatment( ATT) liter used in one sq mtr floar area? & what is ratio of ATT & water.
develpement lengh
how do i find the fixed end moments in the fixed beams with the use of general method?
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
1. How do you handle non-productive team members?
appsc AEE'S interview questions wanted
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Define Chimney in Thermal power plant?
WAS PUMP MODEL WXB DESIGNEDIN ACCORDING API 610 STANDARD?
1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 + 1 - 1 + 1 + 1 + 1 + 1 + 1 + 1 x 0 = answer??? pzl tell the rite answer ??
what"s the purpose of dry lean concrete(DLC)and where it"ll be use it?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)