how many stones require for rr masonery work 1cum.
Answer Posted / santosh singh
For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work
Is This Answer Correct ? | 24 Yes | 2 No |
Post New Answer View All Answers
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
What are the uses of groynes?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
What is Density of cement, sand & aggregate ?
What you understand by richter scale?
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
Which architectural movement is also known as jazz moderna?
insted of bentonite we can use any alternate material in piling ?
What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m
In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
How to calculate carrying capacity of the existing water supply trunkmain
What is meant by engineering drawing?