Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how many stones require for rr masonery work 1cum.

Answer Posted / santosh singh

For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work

Is This Answer Correct ?    24 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HOE TO YOU PLAN TO ACCHIEVE THE GOALS?

2139


Test procedure of fly ash bricks as per code ?

2600


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2144


Formula of area of crane hook

2027


silt%= silt volume/ silt+sand volume is this right?

2031


is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?

5389


afe or not

2194


1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.

8137


States some of the tool bars used in cad?

1213


we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

2633


WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?

2474


How to calculate Volume of Wet cement concrete for a specific grade?

2274


Explain moment of inertia and its importance.

1314


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2273


How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1855