how many stones require for rr masonery work 1cum.

Answer Posted / santosh singh

For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work

Is This Answer Correct ?    24 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete

1622


What are the uses of groynes?

682


Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot

1833


Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.

1414


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1775






What is Density of cement, sand & aggregate ?

1060


What you understand by richter scale?

718


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

1349


Which architectural movement is also known as jazz moderna?

842


insted of bentonite we can use any alternate material in piling ?

1710


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

1749


In the present situation of ban on mining sand from rivers,can we go for formation of earth dam filters viz;Horizantal sand blanket,inclined chimney and filters under rivetment with crushed rock sand of 6mm down size.If so what are the specifications and is there any codal provision for its authentication?

1502


strength of bitumen concrete with 80-100 & 60-70 grade bitumen

1672


How to calculate carrying capacity of the existing water supply trunkmain

1809


What is meant by engineering drawing?

664