indiploma civil engineering student r studied is456-1978.
but in practicial we r using 2000 version
i think 1978 version didn't use the student.
any openion?
how meny typs of renging rod?
how many types of foundation
How to calculate Cement, Sand and Kapachi required for M20, M25
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
0 Answers Civil Service, Intelinet, Marg, PMC,
what"s the formula find the cement consumption for brick work 23 thick wall 1 m3?
7 Answers L&T, Vipul Chemicals,
Explain the water bound macadam roag
What black man invented the clothes dryer?
How to calculate Brick for 9"wall for100sqft
How do you maintain water pressure?
What is mean concrete class c35/20. Here C35 and 20 means?
how many no of cement bags required for 1:4 plastering for 100 sqft? how many no of cement bags required for 1:3 plastering for ceiling for 100 sqft?
What is code for designing a sheet pile?