Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


In foundation design, while we do the base pressure check,
we normally check if the attained pressure value is less
than the GROSS BEARING CAPACITY of the soil which is the
sum of net bearing capacity of soil and the overburden
pressure. Actually, the overburden pressure acts against
the net bearing capacity of the soil and I feel that we are
actually increasing the bearing capacity value and doing
the check. I feel that this is NOT right. Please clarify on
this.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

plz. how many times required for compacting subbgrade in road way & how many water required?

1 Answers   Sail,


how many weight of 1Cum Sand ???

4 Answers   CCC,


Specific gravity of cement?

0 Answers  


9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement

8 Answers   L&T,


21. Are you able to work under pressure?

1 Answers  


silt maximum in sand.

11 Answers   DLF,


What materials were used to build the golden gate bridge?

0 Answers  


Slow setting admixture is used in mass concrete because of – –

4 Answers   Reliance,


How many different between estimated quantity and practical work at site.

1 Answers  


how to calculate quantity of steel & concrete in stair case

7 Answers   Al Fara, Indu Projects, Orbit Corporation, Shree Shakti Enterprises,


how can i calculate pcc and rcc cu.mtr rate? specify labor and material cost should be diff

2 Answers  


What is lever arm distance

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)