In foundation design, while we do the base pressure check,
we normally check if the attained pressure value is less
than the GROSS BEARING CAPACITY of the soil which is the
sum of net bearing capacity of soil and the overburden
pressure. Actually, the overburden pressure acts against
the net bearing capacity of the soil and I feel that we are
actually increasing the bearing capacity value and doing
the check. I feel that this is NOT right. Please clarify on
this.
No Answer is Posted For this Question
Be the First to Post Answer
which grade of concrete according to Indian Standard 800:2007 has highest strength?
define silt?
how tl calculate lap lengh of concrete in different grade of concrete.
Every Engg. know that =dia*dia/162.2 is Steel weight Formula, But very less people Know that orgin of 162.2 asumption.
3 Answers ATS, Eurotech Construction, Juniper Networks,
For a RCC section with congested reinforcement , what is the compaction factor
2 Answers Arihant, GMR, Gulf International Contracting, NBCC,
Manpower required for de shuttering of conccrete slab
which red: used in roof teping, then use only cement
8. What do you find more useful in your present work – your education or your practical experience from previous jobs or traineeships?
if 20mm & 10mm coarse aggregate we have consider same prapotion than how to analysis m25 concrete
What is the weight of 10mm,20mm,40mm aggregate per cubic
HOW YOU CAN DETERMINE THE WEIGHT PER METER OF STEEL RODS EASILY?
indiploma civil engineering student r studied is456-1978. but in practicial we r using 2000 version i think 1978 version didn't use the student. any openion?