In foundation design, while we do the base pressure check,
we normally check if the attained pressure value is less
than the GROSS BEARING CAPACITY of the soil which is the
sum of net bearing capacity of soil and the overburden
pressure. Actually, the overburden pressure acts against
the net bearing capacity of the soil and I feel that we are
actually increasing the bearing capacity value and doing
the check. I feel that this is NOT right. Please clarify on
this.
No Answer is Posted For this Question
Be the First to Post Answer
plz. how many times required for compacting subbgrade in road way & how many water required?
how many weight of 1Cum Sand ???
Specific gravity of cement?
9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement
21. Are you able to work under pressure?
silt maximum in sand.
What materials were used to build the golden gate bridge?
Slow setting admixture is used in mass concrete because of – –
How many different between estimated quantity and practical work at site.
how to calculate quantity of steel & concrete in stair case
7 Answers Al Fara, Indu Projects, Orbit Corporation, Shree Shakti Enterprises,
how can i calculate pcc and rcc cu.mtr rate? specify labor and material cost should be diff
What is lever arm distance
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)