how to calculate sand, aggregate and cement in m25 concrete?
Answer Posted / narayan rijal
1.52/(1+1+2)*28.81=cement bags
0.41=sand
0.83+aggregate
| Is This Answer Correct ? | 3 Yes | 8 No |
Post New Answer View All Answers
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
What is construction mitigation management?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
use ofr concrete as per grade ?
what will happen if one could not properly follow the spacing of slab reinforcement bar?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
How can i do RCC rate analysis?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
What are the alternate material for steel, Sand and aggregate
How cracks in concrete can be avoided?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
how much required strength of cement concrete bricks(size 230x115x75mm)
What is the difference between Hinged and pinned in Column ends
what is the composition of good brick ?
crank types