how to calculate sand, aggregate and cement in m25 concrete?
Answer Posted / rohit singh
Grade m25= 1:1:2 , sum=1+1+2=4
Dry concretein 1 cum =1. 52
Cement =1. 52/4=. 38*28. 8=10. 94bags cement /cum concrete
Sand=1. 54*1/4=. 38cum
Aggregate=1. 54*2/4=. 76cum
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is Refuse Area In High Rise Building ?
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
Slab quantity
What is the release of lien?
What is unit weight of normal concrete?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
what is the most suitable foundation when construct a bird watching tower in a marshy land
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
How do You Maintain a structure after getting cube test of low strength.
What is labor and material payment bond?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Why Vitrified tile are getting pop up.
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
Explain what is Critical Path Method (C.P.M)?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.